The half-built basement during the renovation, a group of people working inside

Our story

There was nowhere
to hold anything.
So we built it.

Six weeks, one basement and dozens of people from the student club who came down after lectures to paint, sand and hammer benches together. Without them this bar would not exist.

How it started

The same wall every time: nowhere to do it

All three of us were active members of ISC, the International Student Club, which later became ESN. We wanted to run more events and kept hitting the same problem — there was nowhere to run them. Finding a room big enough held us back so often that we decided to get our own.

We went after a basement under Masaryk dorm at CTU, the building where most international students live. It took months of negotiating before we got it on a lease. When the keys finally arrived, the place needed rebuilding from scratch.

The empty dark basement before the renovation
This is what we got the keys to. (1/4)

Six weeks

What got done in that time

Walls repaired

Stripped, patched, sanded. The dullest and longest part of it.

Everything repainted

The whole basement, ceiling down to the floor markings.

New lighting

The old lighting made it feel like a cell. We added tens of metres of LED strip and new fittings.

Furniture built by hand

Benches, the bar and some of the tables. Not bought — made.

6
weeks
348 m²
rebuilt
34
benches, made here

Before and after

Grab the handle and drag

The main hall after the renovation, blue backlighting, benches and tables
The main hall before the renovation, dark and empty
↔
beforeafter
The main hall
The bar area after, cork world map and clocks showing world times
The bar area before, orange walls and old furniture
↔
beforeafter
The bar area and the map wall
The finished bar counter
The bar counter before the renovation
↔
beforeafter
The bar

Who built it

It was not just the three of us

Six weeks was only possible because of an enormous amount of help from ISC members. They came after lectures, at weekends, wearing bin bags instead of overalls. Some painted, some sanded wood, some cooked for everyone else so the work could carry on.

Most of them still drink here. And on one wall it still says, in handwriting, who painted it.

This is not a bar somebody bought. It is a bar a community built for itself.

Handwriting on a red wall reading painted by Otilia from RO

“painted by Otilia from RO” — a signature that stayed on the wall.

From the build

Six weeks in pictures

Painting the letters ISC onto an orange wallPainting a wall, wearing a bin bag over clothesTwo people on ladders painting the ceiling and wallSanding a wooden board for the furnitureBuilding the bar counterISC HUB painted across the wallA group of club members in the doorway of the half-built barTwo people chipping plaster off the orange wallFitting the ventilation ducting, one holding the ladder, one screwing it inA painter in a plastic poncho giving a thumbs up, roller in handAssembling wooden furniture on the floor in front of the barA club member with a cordless drill next to a half-built benchHanging the world clocks on the wall using a laser levelClub meme: laundry, cleaning, gym and studying — and now ISC HUB

Today

It is not just ours

The space is used by ESN CTU, the other Prague ESN sections and student clubs like BEST and IAESTE. Czech and international students drink here in the evenings, and during the day companies run training in the same room.

ESN CTUESN CUESN UCTESN CZUBESTIAESTE
The three owners of ISC HUB sitting on benches they built themselves
A training session in the ISC HUB hall

Looking for a venue?

A 290 m² hall for 200 people in Dejvice. Training, parties, celebrations.

Terms and pricing →